The Air Form method represents a step up in technology and equipment required. It is significantly more efficient and saves about 55% of labor compared to the no mold method. The air form can be reused many times.
Included with the Air Form Video Course:
- the bamboo e-manual
- the basalt e-manual
- the no-mold video course – 23 videos
We strongly suggest FIRST watching the “No Mold Method” videos . The foundational No Mold Method comprises 23 lessons and you will gain deeper insight into methods and know-how.
Remember to get in touch for any questions and clarifications along the way.
Course Outline
- AF The Manuals Bundle - The Bamboo and The Basalt Dome Building Manuals
- AF 1. Introduction to the No Mold Method
- AF 2. What is a Shell Structure
- AF 3. The 3.0m Dome Plans and Specifications Overview
- AF 4. Health and Safety on a Construction Site
- AF 5. Material Quantities and Where to Source Them
- AF 6. Tools Required to Build a Concrete Domeshell
- AF 7. Set-out for the Concrete Slab
- AF 8. Set-up for a Relocatable Concrete Slab & Fabricate Form Work
- AF 9. Casting a Relocatable Slab Time Lapse
- AF 10. Slab on Ground Including Footings and Excavation
- AF 11. Fabricate the Center Pole and Carousel System
- AF 12. Installing and fixing the Vertical Basalt Starter Bars
- AF 13. Installing and Fixing the Horizontal Basalt Rebar
- AF 14. How to Prefabricate the Door and Window Frame Molds
- AF 15. Placing Render/Plaster into the Door and Window Frame Molds
- AF 16. Prefabricate a Skylight Hob Ring
- AF 17. How to Prefabricate a Concrete Ring for a Glazed Skylight
- AF 18. Install the Prefabricated Door and Window Frames
- AF 19. Basalt Frame Around the Hoods Over the Door and Window
- AF 20. How We Fix the Basalt Mesh over the Basalt Cage
- AF 21. Installation of Electrical Conduit Into the Dome Frame
- AF 22. How We Apply the Layers of Cement Render
- AF 23. Finishes to the Concrete Dome
- Air Form Lesson 1 - Why Use an Air Form
- Air Form Lesson 2 – Ordering and Preparing the Air Form
- Air Form Lesson3- Install Air Form Hold Down Angle
- Air Form Lesson 4-Fabricate and Install Centre Pole
- Air Form Lesson 6 - Test Inflate the Air Form
- Air Form Lesson 7 - Regulate the Air Form Air Pressure
- Air Form Lesson 8 - Center Pole Carousel Set Up
- Air Form Lesson 9 - Starters & Vertical Basalt Bars
- Air Form Lesson 10 - Fix the Horizontal Basalt Rebars
- Air Form Lesson 11 -Fabricate Door and Window Openings
- Air Form Lesson 12 - Shotcrete the Shell
- Air Form Lesson 13 - Spray Machines and Mix Designs
- Air Form Lesson 14 - Deflate the Air Form
- Air Form Lesson 15-Install Door and Window Frames Prepare for Perlite
- Air Form Lesson 16 - Perlite Layer Waterproof and Finish
